Specification, model and quantity: DN250-4MPa, length: 180m test pipe section. The test effect was good after 24 and 22 hours.
In 2025, we will win the bid for 108km (DN210-16MPa/DN210-12MPa/DN210-6.3MPa/DN200-16MPa/DN200-12MPa/DN200-6.3MPa).
Conveyed medium and industrial and mining: Iron tailings, high flow rate, severe abrasion.
Product structure: The inner lining layer adopts co-extruded POE, the reinforcing layer material uses steel cord pre-impregnated tape, the outer protective layer adopts HDPE, and the connection method adopts crimped flanged threaded joint.
![]()