Project Time: May 2023
Project Name: Glass Fiber Reinforced Polyethylene Composite Pipe Water Injection Pipeline Project of Changqing Oilfield Oil Production Plant No. 12
Specification and Quantity: DN65-25MPa, length: 9.5Km;
Transmission Medium and Temperature: sulfur-containing wastewater, operating temperature: -40 ℃ -60 ℃. Working Environment: hilly areas; it has been running well since its operation in 2023.