Project Time: August 2023
Project Name: Liaoning Dandong Shengquan Phoenix City Water Diversion Project
Specification and Quantity: DN250-3MPa, length: 21,700m;
Transmission Medium and Temperature: Hot spring water (sulfur-containing), medium temperature 80 ℃.
Working Environment: undulating hills with a height difference of about 130m, high corrosive, adopting non-metallic electric melting joints.